4 of 4 projects

Tracked Baltic projects
ProjectStatusPower update
Greenergy Hüüru expansionEstonia · Hüüru, Harju County Under constructionGrid application filed; 22 MW hall planned
Tet DC7Latvia · Salaspils Phase 1 openedPhase 1 opened; electrical MW not disclosed
Kruonis DCLithuania · Kruonis PlanningUp to 200 MW grid reservation; energisation unconfirmed
Telia RaisteniškėsLithuania · Raisteniškės, Vilnius district Under construction2 MW initial facility design
How capacity is classified
Requested grid capacity
Capacity sought from a network operator; not evidence of approval.
Secured connection capacity
Capacity the network operator confirms as reserved or contracted. A conditional reservation is not an energised connection.
Facility capacity
Power reported for a site, phase or hall. A design figure or expansion target is not operating capacity.
IT load
Power explicitly attributed to computing equipment, excluding building overhead.

These figures are not additive. A value marked not disclosed is missing from the sources checked, not zero. The tracker covers selected projects, not a complete market inventory.