Tet DC7

Salaspils municipality confirmed the opening of DC7 and reported 112 racks. Rack count and recoverable heat are not electrical capacity.

Location
Salaspils, Latvia
Operator or developer
Tet
Development status
Phase 1 opened [1]
Record checked

Power and connections

Capacity by type and state
Capacity typeDisclosed power and scope
Requested grid capacity Not disclosed
Secured connection capacity Not disclosed
Facility capacity Not disclosed
IT load Not disclosed

Investment activity

Over €10 million in phase 1; over €30 million for the project
Reported investment figures; phase 1 is part of the project total. [1]

Project milestones

Primary sources

  1. Salaspils municipality: DC7 opening in Salaspils Published · Checked
  2. Tet: Phase 1 building commissioned Published · Checked
  3. Latvia Public Utilities Commission (SPRK): District heating regulatory sandbox Published · Checked